Phones answered 24/7Austin, TX 78701
Call (833) 751-2102
(833) 751-2102
Serving Travis County

Roof Replacement in Austin, TX

A full roof replacement, planned from a written inspection, with the tear-off, decking and new roof explained before the work starts.

  • Hail and wind damage
  • Travis County and suburbs
  • Roof repair and replacement

Get a fast quote

Fastest: call (833) 751-2102. Or send this and we call you back.

Replacement

Roof Replacement: what it covers

Quick answer

A roof replacement removes the existing roof covering, checks the decking underneath, and installs new underlayment and roofing material. In Austin the decision usually follows a hail or wind inspection, the roof's age and the number of past repairs. The technician explains the findings and the choices before any work is scheduled, and the work is confirmed in writing first.

Roof Replacement illustration for Austin, TX

Replacing a roof is a large job, and most of it is hidden. The new shingles are what the homeowner sees, but the decking, the underlayment, the flashing and the ventilation decide how long the roof will last. A good replacement is planned from what is found under the old roof, not only from what is on top of it.

Austin Roofing connects Austin callers with a local technician who inspects the roof, explains the options and arranges the work with an independent local company. The technician does not promise a warranty or a finish date that the company has not confirmed in writing, and the replacement is quoted after the inspection.

Austin's roofs have been through many storm seasons, and a replacement is often the right answer after several hail or wind events. The sections below cover how the decision is made, what the work includes and how to plan the schedule.

Service area
Austin & Travis County
Availability
Phones answered 24/7
Warning signs

Signs you need roof replacement

A roof replacement involves a crew working at height, with tools, ladders and debris. Keep clear of the drop zone under the roof edge, keep children and pets indoors while the tear-off runs, and do not go onto the roof while the work is under way. Ask the crew to show you where the access points are, and make sure the path to the house is kept clear for the crew and for emergency access.

  • Shingles curling, cracking or losing granules across most of the roof
  • Several leaks in different places over the past few storm seasons
  • Soft or spongy decking at the eaves or near a valley
  • Shingles with a dull, chalky look and bare patches in the grit
  • Roof age near or past the typical life of the material on the roof
  • Repeated patches that do not match the rest of the roof
  • Daylight visible from the attic through the decking in more than one spot
Options

Types and options for roof replacement

Full tear-off and replacement

The most thorough option. The whole covering is removed to the decking, and the decking is checked and repaired before the new roof goes on. This is the usual choice when the roof has broad storm damage or is near the end of its life.

Overlay over an existing roof

Where the existing roof is sound and the local rules allow it, a new layer can be laid over it. This is faster, but it hides the decking, so the technician explains the trade-off before it is chosen.

Slope-by-slope replacement

Only the slopes that are badly damaged are replaced, with the others left in place. It needs careful matching, and the technician says whether the match is close enough to be sound.

Need roof replacement today?

Call any hour and explain what is going on. You get a clear price before any work starts.

How is a replacement decided on an Austin roof?

The decision combines the roof's condition, its age, the storm damage and the number of past repairs. A roof that has had several leaks and broad hail damage is usually a replacement candidate, and the inspection states the reasons.

The first question is whether the damage is local or spread. Local damage is usually repaired. Spread damage across most slopes, or granule loss and cracked mats throughout the roof, points toward replacement. The second question is the roof's age and how many repairs it has needed, which the inspection records.

The third question is the decking. A roof can look sound from above and still have soft boards underneath, so the decision is confirmed only once the tear-off reveals the decking. The inspection states that uncertainty clearly, so the homeowner is not surprised later.

What happens to the decking during a replacement?

The decking is checked once the old covering is off. Soft, rotted or delaminated boards are replaced, and the rest is left in place if it is sound. The decking is the structure the roof is fixed to, so its condition matters more than the covering on top.

Decking is usually plywood or oriented strand board laid over the rafters. Moisture from leaks or from long wet periods weakens it, and a board that has swelled or softened will not hold a nail properly. The technician checks each panel and marks the ones to replace, and the homeowner is shown the findings.

Replacing damaged decking is an extra cost that often surprises owners. The inspection cannot always show it in advance, so the scope states how decking repairs are handled and how they are recorded.

What does a replacement include beyond the shingles?

A replacement includes underlayment, drip edge, flashing at walls and chimneys, the ridge and the ventilation, as well as the covering itself. Each of these affects how the roof sheds water and how long it lasts.

Underlayment is the sheet laid over the decking before the covering, and it is the second line of defense against water. Drip edge is a metal strip at the eaves and rakes that directs water away from the fascia. Flashing seals the joints at walls and chimneys.

Ventilation keeps the attic at a temperature close to the outside, which helps the shingles last. The ridge vent and the soffit vents are set to match the roof's size. These parts are named in the scope so the homeowner can see what is included.

How long does a replacement take, and what should the homeowner prepare?

A typical house replacement takes one to several days, depending on size, access and any decking repairs. The homeowner should clear the yard and the driveway, move cars and secure outdoor items, and keep pets and children away from the work area.

Weather decides much of the schedule. Work stops in rain and in high wind, so a replacement can take longer than the planned days. The technician gives an estimate of the time and says how weather might change it.

The crew will ask for access to the attic and the exterior water shut-off if a nearby pipe needs care. Homeowners who expect a long job should plan for the noise and the dust, and should keep a clear path to the front door for the crew.

Why is the warranty question worth asking early?

Warranties come from two places: the material maker and the company that installs the roof. They cover different things and last for different periods. Ask for both in writing before the job starts.

Material warranties usually cover manufacturing faults, and installation warranties cover the way the work was done. A warranty is only as useful as its terms, so read the exclusions and ask what the registration process is. This website does not give any warranty of its own on the work.

The independent local company that does the work is the party that stands behind it. The technician names that company and explains what it has committed to in writing.

Our process

How our roof replacement visit works

  1. Inspect and record the existing roof

    The technician records the roof's condition, its age as the homeowner gives it, the past repairs and the storm history. The written inspection is the basis for the scope of the job.

  2. Plan the scope and the materials

    The scope lists the tear-off, the decking repairs, the underlayment, the flashing, the ventilation and the new covering. Materials are named so the homeowner knows exactly what is being installed.

  3. Tear off and inspect the decking

    The old covering is removed and the decking is checked panel by panel. Soft or rotted boards are replaced, and the findings are photographed before the new underlayment goes on.

  4. Install the underlayment, flashing and covering

    New underlayment, metal drip edge and flashing go on first, then the new roofing material. The ventilation is set so the attic breathes, and the ridge is finished last.

  5. Clean up and record the finished roof

    The yard is cleaned, magnets sweep for nails, and the finished roof is photographed slope by slope. The record is given to the homeowner with the materials used and the work completed.

Travis County

Why roof replacement is different in Central Texas

Austin's owner-occupied rate is 44.4 percent, against 62.6 percent for Texas as a whole (Census Bureau QuickFacts, 2019-2023). Roughly half of the city's occupied homes are not owner-occupied, so a replacement is often decided by a landlord, a property manager or a family that is not living in the house.

The 28 May 2025 hail and wind warning covered much of Travis and Williamson counties, and a replacement after storm damage is often scoped from that record. The storm record is part of the decision, not an afterthought.

Bee Cave and Lakeway sit on the Hill Country road corridor west of the city, and both have been growing. A roof there is often replaced as part of a larger renovation, and the scope is planned around the renovation schedule.

Related

Impact-Resistant Shingle Roofing

Impact-rated shingles for roofs in the central Texas hail belt, with the rating, the warranty and the install explained before you buy.

Metal Roof Installation

Metal roofing panels, seams and fasteners installed to the maker's details, with the hail and wind questions answered before the order is placed.

Roof Deck Repair and Tear-Off

Stripping the old covering, checking the sheathing panel by panel, and replacing the boards that have failed before the new roof goes on.

Roofing for Rental Properties

Roof inspections, repairs and replacements for landlords and property managers, with written records that tenants and insurers can rely on.

Guides

Read before you book

FAQ

Roof Replacement FAQs

How do I know if I need a full replacement?

The inspection shows whether the damage is local or spread, and it notes the roof's age and repair history. A full replacement is usually recommended when the damage is spread across most slopes or the decking is soft.

Will the new roof match the old one?

A full replacement is a new roof, so the material is chosen for the house. A partial replacement needs matching, which is not always exact. The technician says how close a match is likely.

Does a replacement mean my insurer will pay for it?

Not necessarily. If the replacement follows storm damage, the insurer decides what is covered under the policy. The inspection record supports that decision and does not make it.

What if the decking is damaged under the old roof?

The decking is repaired or replaced once it is exposed. The scope says how decking repairs are priced and approved, so the homeowner is asked before extra work is done.

How soon can a replacement be scheduled?

It depends on the season and the crew's schedule. A written plan is given once the inspection is complete. Call (833) 751-2102 to book an inspection, and the start date is confirmed when the scope is agreed.

Do you give a warranty on the work?

This website does not. The independent local company that does the work sets out its own warranty and the material warranty in writing. Ask for both before you agree to the job.

WhatsApp